D’Orazi, L.
Use dynamic simulation for advanced LNG plant design
Gas Processing/LNG
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Engineering & Design
/ Europe
/ Gasification
/ Middle East
/ Natural Gas
The work performed for the project shows that dynamic simulation can be an excellent tool for the support and verification of process design during the engineering, procurement and plant construction (EPC) stages.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- BASF intends to take over shares in Alsachimie JV from DOMO Chemicals 5/28
- ExxonMobil to sell French subsidiary Esso to Canadian energy group 5/28
- UPM cancels second Rotterdam biomass-to-fuels refinery 5/28
- Uniper, thyssenkrupp Uhde partner to build large-scale ammonia cracker in Germany 5/27
- Wood selected as project management consultancy for first major methanol plant in the UAE 5/27
- Indian refiner Reliance's April Russian oil imports up 55% m/m 5/27
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction