Mahulkar, S.
Saneep Mahulkar is Group Lead for Cracker Technology at the Center of Excellence at Reliance Industries Ltd. in India. He has been working with Reliance for the past 14 yr in various roles. He supports existing steam cracker sites with troubleshooting and carrying out revamps. He holds an MS degree in chemical engineering from the University of Twente.
Case study: Heat exchanger tube rupture and its impact on metal embrittlement
Process engineers strive to recover as much energy as is practically possible from the available process and utility streams within the constraint of the plant. To achieve this goal, traditional—and sometimes non-traditional—methods are utilized. In a steam cracker, light olefins are considered the highest-value products, and utilizing “cold energy,”
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- WinGD delivers exceptional results in full-load X-DF-A ammonia engine test 3/14
- COAMO Agroindustrial Cooperativa selects ICM for design and engineering of new corn biorefinery in Brazil 3/14
- South Dakota (U.S.) bans use of eminent domain for CO2 pipelines 3/14
- ABB and Charbone Hydrogen sign agreement to advance North American green H2 production facilities 3/14
- U.S., Vietnam firms sign deals on energy and minerals 3/14
- Russian diesel continues to flow to Syria on U.S.-sanctioned tankers 3/14
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction