Mahulkar, S.
Saneep Mahulkar is Group Lead for Cracker Technology at the Center of Excellence at Reliance Industries Ltd. in India. He has been working with Reliance for the past 14 yr in various roles. He supports existing steam cracker sites with troubleshooting and carrying out revamps. He holds an MS degree in chemical engineering from the University of Twente.
Case study: Heat exchanger tube rupture and its impact on metal embrittlement
Process engineers strive to recover as much energy as is practically possible from the available process and utility streams within the constraint of the plant. To achieve this goal, traditional—and sometimes non-traditional—methods are utilized. In a steam cracker, light olefins are considered the highest-value products, and utilizing “cold energy,”
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- EPA finalizes historic new renewable fuel standards to strengthen American energy security 3/30
- The role of integrated biorefineries in achieving alternative fuel goals 3/30
- The entire Itabus fleet travels with Enilive HVO diesel biofuel 3/30
- Czech government agrees to release 100,000 tonnes of crude from reserves 3/30
- South Korea's LG Chem to import Russian naphtha 3/30
- PetroChina says operations 'overall normal', Strait of Hormuz accounts for about 10% of its supplies 3/30
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

