Saneep Mahulkar is Group Lead for Cracker Technology at the Center of Excellence at Reliance Industries Ltd. in India. He has been working with Reliance for the past 14 yr in various roles. He supports existing steam cracker sites with troubleshooting and carrying out revamps. He holds an MS degree in chemical engineering from the University of Twente.
Case study: Heat exchanger tube rupture and its impact on metal embrittlement
Process engineers strive to recover as much energy as is practically possible from the available process and utility streams within the constraint of the plant. To achieve this goal, traditional—and sometimes non-traditional—methods are utilized. In a steam cracker, light olefins are considered the highest-value products, and utilizing “cold energy,”
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Bechtel greenlit for Sabine Pass Liquefaction expansion in Southwest Louisiana (U.S.) 5/29
- Philippines receives rare Iranian crude cargo after wartime disruption 5/29
- Gazprom and Sibur resume talks on possible ethane project to supply additional feedstock to the Kazanorgsintez petrochemicals plant 5/29
- European Commission debates policy shift to protect industry from China 5/29
- Mitsui seeks LNG investments to meet power demand from data centers 5/29
- Kenyan government backs Gulf fuel supply deals after opposition criticism 5/29
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction