Mahulkar, S.
Saneep Mahulkar is Group Lead for Cracker Technology at the Center of Excellence at Reliance Industries Ltd. in India. He has been working with Reliance for the past 14 yr in various roles. He supports existing steam cracker sites with troubleshooting and carrying out revamps. He holds an MS degree in chemical engineering from the University of Twente.
Case study: Heat exchanger tube rupture and its impact on metal embrittlement
Process engineers strive to recover as much energy as is practically possible from the available process and utility streams within the constraint of the plant. To achieve this goal, traditional—and sometimes non-traditional—methods are utilized. In a steam cracker, light olefins are considered the highest-value products, and utilizing “cold energy,”
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Hunt Refining's Tuscaloosa refinery (U.S.) expedites maintenance, repairs on fire-damaged coker unit 5/23
- SIBUR-Sinopec's Amur GCC expects to produce first polyethylene in Q3 2026 5/23
- Phillips 66's Los Angeles (U.S.) refinery layoffs to begin in December, sources say 5/23
- Nigeria's Dangote refinery agrees to export polypropylene with Vinmar 5/23
- ExxonMobil Joliet refinery (U.S.) running unit at reduced rate 5/23
- Suncor reports flare replacement project at the Montreal refinery in coming weeks 5/23
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction