Zolfkhani, M.
Optimize LNG boil-off gas systems for regasification terminals
Gas Processing/LNG
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Engineering & Design
/ Europe
/ Gas to liquids (GTL)
/ Gasification
/ Middle East
/ Natural Gas
Depending on LNG composition, N2 content and plant operating mode, an operating pressure of 7 barg to 8 barg was found by the study to be the optimum pressure range.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- U.S. says there are significant undiscovered oil and gas resources in Wyoming 5/21
- Bureau Veritas grants AiPs for IMODCO’s portfolio of jetty-less solutions for new energies transfers 5/21
- Saudi Arabia crude exports fall to 5.754 MMbpd in March 5/21
- Low diversity in critical mineral markets could hurt industry, IEA says 5/21
- India's Russian oil imports hit 10-month high on strong demand for ESPO crude 5/21
- Akselos tackles flange failures with breakthrough SPM module 5/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction