Panchal, A.
Anilkumar Panchal has more than 15 yr of experience as a Mechanical Design Engineer, including hands-on work experience in pharmaceutical solid and semi-solid product plants, butyl rubber, gasification, ethane cracker, chlorinated PVC and various revamp projects. He holds a BS degree in mechanical engineering and an MS degree in industrial process equipment design. Panchal is a certified Chartered Engineer and Professional Engineer in India, and has work experience at L&T Heavy Engineering, Bechtel India Ltd., Jacobs Engineering, Reliance Industries Ltd. and KIPIC, Kuwait. The author can be reached at anil0208@gmail.com.
Practical application of expansion joints for heat exchangers
Expansion joints are used throughout industry for various purposes.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- EPA's proposed eRIN program raises concerns and sparks legislative action 6/8
- Neste enables Swedish airport and Västflyg airline to become the world's firsts to use SAF on all flights 6/8
- Valtek Valdisk High Performance Butterfly Valve, completes million-cycle test 6/8
- The sustainable aviation fuel entrepreneurs poised for takeoff 6/8
- India's May fuel consumption soars on robust manufacturing 6/8
- Kent awarded three-year multi-site Master Services Agreement with TotalEnergies 6/8
- VOC reduction at Raffineria di Milazzo’s SRU complex—Part 2
- Digital Technologies: Do not just monitor bad actor machines: Start when they are healthy
- People
- Editorial Comment
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
- How companies can take advantage of APM solutions to reduce planned maintenance
- Design considerations when flaring ethylene oxide
- Why sulfur plants fail: An in-depth study of sulfur recovery unit failures—Part 1
- Implement advanced level control techniques to improve crude distillation unit stabilizer performance
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction