Modi, R.
Access before acceptance: Chip redundancy for SIS
Maintenance & Reliability
/ Process Control
/ Engineering & Design
/ Europe
/ Information Systems
/ Management
/ Middle East
Desired automated plant safety functions are implemented via electrical relays, non-programmable solid-state electronics and programmable electronics (PEs) like microprocessors and microcontrollers. I..
Rethink the hazards in your process
Environment & Safety
/ Process Control
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Economics
/ Engineering & Design
/ Europe
/ Information Systems
/ Loss Prevention
/ Middle East
/ Safety
In designing process safety systems, “more” is not necessarily better. Advanced technology has created a mindset to over-install hardware to prevent or to reduce the risk of failure in hydro..
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Carbon capture tops agenda at GPAE Conference 2025 6/17
- INEOS to cease phenol production at German site, cites high European energy costs and CO2 tax policy 6/17
- Petrobras signs $892 MM in contracts to complete RNEST Train 2 refinery expansion 6/17
- China's May refinery throughput at 9-month low on plant overhauls (1) 6/17
- bp completes turnaround work at 250,000-bpd refinery in Washington (U.S.) 6/17
- Japan's Eneos restarts 77,000-bpd Kawasaki CDU after unplanned shutdown 6/17
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction