Matzopoulos, M.
Improve engineering via whole-plant design optimization
Petrochemicals
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Catalysts
/ Construction
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Middle East
New simulation methods identify cost-effective advantages early
Consider new analysis for flares
Applying dynamic models in designing safety systems can reduce capital costs
Enhanced methods optimize ownership costs for catalysts
Novel model-based innovation techniques enable simultaneous optimization of catalyst formulations and operating reactors
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- South Korea's S-Oil says Q1 refining margins to stay robust 1/26
- Few refineries report problems as deep cold seizes U.S. Gulf Coast 1/26
- INEOS launches new Recycl-IN grade with 70% recycled content for greener packaging 1/26
- AES Andes abandons $10-B green hydrogen project in Chile 1/26
- Biofuels firm Ecoceres running new 420,000-tpy Malaysia plant at near full capacity 1/26
- NEXTCHEM and Siemens Energy cooperate to advance low-carbon fuel solutions and circularity 1/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

