Tellini, M.
Low-pressure absorption of CO2 from flue gas: Plant economics with incentives
Environment & Safety
/ Process Optimization
/ Refining
/ Americas
/ Asia/Pacific
/ Carbon Management
/ Economics
/ Engineering & Design
/ Environment
/ Europe
/ Greenhouse Gases
/ Loss Prevention
/ Middle East
The precedent to this article, published in the April 2011 issue of Hydrocarbon Processing, discussed the chemical feasibility and process engineering design to absorb carbon dioxide (CO2) from flue g..
Low-pressure absorption of CO2 from flue gas
Environment & Safety
/ Gas Processing/LNG
/ Maintenance & Reliability
/ Acid Gas Removal
/ Carbon Management
/ Corrosion
/ Europe
/ Natural Gas
/ Treating
Case study accomplished 95% sequestration using methyldiethanolamine aqueous solution
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Australia’s biggest LNG plants suffer outages due to cyclone, straining global supply 3/27
- Iran war chokes petrochemical supply, sends plastic prices soaring 3/27
- Stockholm Exergi taps Inprocess to deliver advanced process simulator for BECCS project 3/27
- Japan to relax rules from April to boost coal-fired power amid LNG import risks 3/27
- Asia 10-ppm sulfur diesel margin hits record high 3/27
- South Korea enforces naphtha export ban amid Middle East supply disruptions 3/27
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

