DeBaecke, J.
Understanding and maintaining an effective lubrication system
Follow these guidelines to improve gearing equipment life
Improve cooling tower gear drive reliability
Applying commodity products instead of engineered solutions can cause premature failure
Returning submerged gear drives to temporary service
Follow these guidelines to render the unit operational for a significant period before a rebuild is required
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Borouge to develop AI-powered autonomous UAE operations to accelerate growth and value creation 6/25
- Ch0C gas boiler: A French consortium innovates for industrial decarbonization 6/25
- Taiwanese container ship operator to install WinGD's methanol engines across more than 30 vessels 6/25
- EIA: U.S. crude and fuel inventories fall on higher demand 6/25
- Update: Venezuela's second largest refinery restarting units after blackout 6/25
- 3t introduces landmark training to empower women in Saudi Arabia’s energy sector 6/25
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction