DeBaecke, J.
Understanding and maintaining an effective lubrication system
Follow these guidelines to improve gearing equipment life
Improve cooling tower gear drive reliability
Applying commodity products instead of engineered solutions can cause premature failure
Returning submerged gear drives to temporary service
Follow these guidelines to render the unit operational for a significant period before a rebuild is required
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Air Canada and Airbus launch joint initiative to scale domestic Canadian SAF 8/3
- Purdue Biofuels Consortium to bring biodiesel and ethanol blends to diesel engines 8/3
- Convertus closes on $135-MM financing for flagship biofuel facility in Ontario, Canada 8/3
- New process turns mixed plastic waste into hydrogen fuel without sorting 8/3
- Amogy and 2G Energy successfully demonstrate integrated ammonia-to-power generation with natural gas multi-fuel capability 8/3
- Iraq's Baiji refinery output unaffected by fire 8/3
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

