Yusoff, D.
Dasuki Yusoff is a Staff Engineer with Petronas Gas Berhad in Malaysia. He has 12 yr of experience in maintenance, condition monitoring, troubleshooting and reliability improvements of rotating and turbomachinery equipment in gas processing and utilities plants. He earned a Bch degree in mechanical engineering from Universiti Teknologi Malaysia. He is a certified vibration analyst CAT-III from the Mobius Institute.
Amine pumps upgraded for improved operations and reliability
Asia/Pacific
/ Gas Processing/LNG
/ Maintenance & Reliability
/ Carbon Management
/ Economics
/ Engineering & Design
/ Loss Prevention
/ Pumps
/ Rotating Equipment
/ Safety
A gas processing plant in Malaysia eliminated a source of expensive failures in its acid gas removal unit (AGRU).
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Russia's Ryazan oil refinery restores crude processing to 60% of pre-attack level 3/28
- Global refinery capacity totaling 3.6 MM bpd at high-risk of closure 3/28
- More than 20% of global oil refining capacity at risk, analysis finds 3/28
- SABIC Fujian Petrochemicals advances major ethylene project with Lummus technologies and services 3/28
- Singapore fuel oil stockpiles slip to two-week low 3/28
- Sri Lanka minister says Sinopec to start work on refinery by June 3/28
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction