Cypriano, D. L. N.
Consider process-based failure analysis methods for piping and equipment
Environment & Safety
/ Maintenance & Reliability
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Economics
/ Engineering & Design
/ Europe
/ Information Systems
/ Loss Prevention
/ Management
/ Middle East
/ Safety
Avoiding incident (or accident) recurrences at industrial systems is a long-standing problem, and it involves process safety strategies (PSSs). Incurring zero incidents is the ultimate goal for any st..
Improving pH control mitigates corrosion in crude units
Maintenance & Reliability
/ Process Optimization
/ Project Management
/ Refining
/ Acid Gas Removal
/ Americas
/ Asia/Pacific
/ Construction
/ Corrosion
/ Crude oil
/ Diesel
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Heat Transfer
/ Management
/ Middle East
/ Piping
/ Reactors
Equipment and pipe failures can be avoided through better desalting practices and inhibitor injections
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Ningbo Refining & Chemical awards ECI a technology licensing contract for an EVA/LDPE plant in China 4/30
- Fitesa to use Braskem's I'm green bio-based polyethylene grade for nonwovens 4/30
- SIBUR preparing to produce heat-resistant polyethylene in Kazan 4/30
- Aemetis to benefit from the U.S. EPA’s approval of 15% ethanol blend 4/30
- Biofuel maker Neste expects limited impact from tariffs, but supply glut still weighs 4/30
- Portugal's Galp restarting Sines oil refinery over coming days 4/30
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction