Cypriano, D. L. N.
Consider process-based failure analysis methods for piping and equipment
Environment & Safety
/ Maintenance & Reliability
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Economics
/ Engineering & Design
/ Europe
/ Information Systems
/ Loss Prevention
/ Management
/ Middle East
/ Safety
Avoiding incident (or accident) recurrences at industrial systems is a long-standing problem, and it involves process safety strategies (PSSs). Incurring zero incidents is the ultimate goal for any st..
Improving pH control mitigates corrosion in crude units
Maintenance & Reliability
/ Process Optimization
/ Project Management
/ Refining
/ Acid Gas Removal
/ Americas
/ Asia/Pacific
/ Construction
/ Corrosion
/ Crude oil
/ Diesel
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Heat Transfer
/ Management
/ Middle East
/ Piping
/ Reactors
Equipment and pipe failures can be avoided through better desalting practices and inhibitor injections
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- KBR's phenol technology selected by SABIC Fujian Petrochemicals 4/25
- Honeywell Technology helping to produce SAF with lower cost and waste 4/25
- Nigeria's NNPC partners local firm on new 100,000 bpd refinery 4/25
- Stranded cargo shows credit challenges at Nigeria's Dangote refinery 4/25
- Low U.S. distillate consumption reflects slow economic activity and biofuel substitution 4/25
- Clariant catalysts reduce customers’ footprints by 40 million tons of CO2e in 2023 4/25
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction