Newnham, R.
is the senior vice president for OnQuest Canada ULC, a Primoris company. He has over 40 years of experience in the design and operation of direct-fired heaters, including the writing and publishing of four books on this subject. He earned a BSc degree in mechanical engineering from Brighton University in the UK, and is a fellow of the Institute of Mechanical Engineers.
Minimize unplanned shutdowns of fired heater operations
Refining
/ Americas
/ Asia/Pacific
/ Engineering & Design
/ Europe
/ Furnaces
/ Heat Transfer
/ Middle East
/ Piping
There are many potential “rules,” or guidelines, for the safe operation of process heaters.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Ineos to shut polystyrene facility in Illinois (U.S.) by the end of the year 6/19
- How ASTM approval of methanol-to-jet accelerates SAF at scale 6/19
- EU crafts plan to give industries extra free CO2 permits this year 6/19
- PetroChina forecasts Chinese oil consumption will drop 4.9% this year 6/19
- Digital Exclusive: Water injection pump mechanical seals failure after pump shutdown 6/19
- Russian gasoline output down 25% so far in June after drone attacks on refineries 6/19
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

