Newnham, R.
is the senior vice president for OnQuest Canada ULC, a Primoris company. He has over 40 years of experience in the design and operation of direct-fired heaters, including the writing and publishing of four books on this subject. He earned a BSc degree in mechanical engineering from Brighton University in the UK, and is a fellow of the Institute of Mechanical Engineers.
Minimize unplanned shutdowns of fired heater operations
Refining
/ Americas
/ Asia/Pacific
/ Engineering & Design
/ Europe
/ Furnaces
/ Heat Transfer
/ Middle East
/ Piping
There are many potential “rules,” or guidelines, for the safe operation of process heaters.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Diamond Green Diesel approves a SAF project at Port Arthur, Texas (U.S.) 4/26
- Wartsila secures China’s largest-ever methanol newbuild order 4/26
- Aspen Technology introduces new strategic planning for sustainability pathways solution 4/26
- Imperial Oil gets Q1 boost from higher production; refining throughput weighs 4/26
- KBR's phenol technology selected by SABIC Fujian Petrochemicals 4/25
- Honeywell Technology helping to produce SAF with lower cost and waste 4/25
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction