Mayo, S. M.
Stephen M. Mayo has 38 yr of industry experience, and his research is focused on getting the most out of advanced process control. His career has included process engineering and management roles around the world in several different countries in ethylene, refining, LNG, and oil and gas production. Mr. Mayo earned an MBA degree from Oklahoma State University, where he is a chemical engineering doctoral candidate. He is also a registered professional engineer in Oklahoma.
APC maintenance scheduling—Part 2
Advanced process control (APC) projects are supervisory programs that are often thought of as a layer of control above the base regulatory control for a process.
APC maintenance scheduling—Part 1
Advanced process control (APC) projects are supervisory programs that are often thought of as a layer of control above the base regulatory control for a process. The benefits of APC include increased throughput, reduced variation, constraint avoidance, etc., and can be combined to represent a daily economic-equivalent benefit for the application—the same anticipated benefit that led to the justification of the APC installation. Several articles report that after 18 mos–24 mos, more than half of APC installations are performing at either pre-installation levels or have been removed.1,2,3 Although diverse reasons exist for the performance shortfall, a primary reason is that the process characteristics drift from those that generated the controller model.
- 1
- ... 1 pages
- Bechtel greenlit for Sabine Pass Liquefaction expansion in Southwest Louisiana (U.S.) 5/29
- Philippines receives rare Iranian crude cargo after wartime disruption 5/29
- Gazprom and Sibur resume talks on possible ethane project to supply additional feedstock to the Kazanorgsintez petrochemicals plant 5/29
- European Commission debates policy shift to protect industry from China 5/29
- Mitsui seeks LNG investments to meet power demand from data centers 5/29
- Kenyan government backs Gulf fuel supply deals after opposition criticism 5/29

