Samsam Bakhtiari, A. M.
Gas-to-liquids: a look at proposed projects
Gas-to-liquids (GTL) has now become the most talked about petroleum process that has failed to materialize on a massive scale: only 40,000 b/d of capacity is presently onstream worldwid..
HP Impact: HPImpact: What are the consequences of high oil and gas prices?
Continuing high oil and gas pricing may have long-term effects on the international petrochemical industry through product pricing, feedstock selection and market competitiveness. Currently, both crud..
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- BASF supports European 1,4‑butanediol supply security through increased production in Ludwigshafen 2/16
- Vitol backs proposed $3-billion LNG power plant for South Africa's Durban port 2/16
- HAMR Energy receives additional funding for low-carbon liquid fuels projects 2/16
- Geoinform, subsidiary of the MOL Group, signs strategic cooperation agreement with Baker Hughes 2/16
- Hungary asks Croatia for help after Russian oil flows via Ukraine halted 2/16
- U.S. refiner Valero to import up to 6.5 MMbbl of Venezuelan crude in March 2/16
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

