Fu, J.
Consider novel CGC and front-end depropanizer system for olefins production
Petrochemicals
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Boilers
/ Compressors
/ Construction
/ Distillation
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Furnaces
/ Heat Transfer
/ Middle East
/ Naphtha
/ Polymers
/ Reactors
In the presented case study, an innovative design for an integrated CGC-DeC3 system introduces part of the heavier condensate from the early compression stages directly into the high-pressure (HP) depropanizer.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Lummus Technology completes acquisition of NAPCON from Neste, expanding digital and AI capabilities 6/2
- IATA expects sustainable aviation fuel production to double in 2025 6/2
- RIC Energy and Siemens to jointly develop renewable H2, green ammonia and eFuels 6/2
- Trump administration (U.S.) axes $3.7-B in green energy projects 6/2
- European chemical industry pessimistic for 2025, recovery not until 2026 says new report 6/2
- U.S. ethanol output eases off record pace as summer travels heat up 6/2
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction