Markham, N.
Nathan Markham graduated from the University of Kansas with a BS degree in chemical engineering in May 2009. He works as a Process Safety Engineer for ExxonMobil in Spring, Texas.
Coke drum and blowdown system overpressure protection design - Part 1
Environment & Safety
/ Process Optimization
/ Refining
/ Construction
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Safety
/ Maintenance & Reliability
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water. In recent DCU designs, the CD pressure relief valves (PRVs) also discharge to this system and then to the flare system via the BD PRVs.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Clariant launches innovative PFAS-free polymer processing aids for more sustainable polyolefin extrusion 6/5
- Solvay and BASF together reduce scope 3 emissions in hydrogen peroxide production 6/5
- Equinor's Mongstad refinery shut after power outage, gas leak 6/5
- ~2,000 gallons of diesel spills in Baltimore waterfront, U.S. officials say 6/5
- Asia's fuel oil imports from Iraq hit 4-month high in May 6/5
- Japan's Eneos begins unplanned shutdown at 77,000-bpd unit at Kawasaki 6/5
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction