Ceary, P. J.
Philip Ceary graduated from the University of Maryland College Park with a BS degree in chemical engineering in May 2002. He works in the field of process design, optimization and logistics, and project development for ExxonMobil in Spring, Texas.
Coke drum and blowdown system overpressure protection design - Part 1
Environment & Safety
/ Process Optimization
/ Refining
/ Construction
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Safety
/ Maintenance & Reliability
The blowdown (BD) system in delayed coking units (DCUs) receives waste streams generated during the coke drum (CD) decoking process to recover valuable hydrocarbons and water. In recent DCU designs, the CD pressure relief valves (PRVs) also discharge to this system and then to the flare system via the BD PRVs.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Southern Energy Renewables and Axens Sign MoU to advance SAF projects in Louisiana and beyond 4/8
- One of the largest heat pumps in the world has reached BASF's Ludwigshafen site 4/8
- LANXESS introduces surcharge for Lewatit ion exchange resins 4/8
- HyOrc secures industrial site and accelerated permitting path for Portugal green methanol project 4/8
- India raises HPCL Rajasthan Refinery project cost to $8.6 B 4/8
- Iranian Oil Refining Co. confirms attack on Lavan refinery 4/8
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

