Yahyaabadi, R.
Consider practical conditions for vacuum unit modeling
A good simulation model is a tool that reveals critical operating conditions and can be applied to daily operations
Improve design strategies for refinery vacuum towers
Products yield and specifications with energy conservation goals can determine options to revamp distillation units
Increase distillation capacity with side heaters and coolers
Debottlenecking towers involves close review of product yields while reducing tray flooding and energy consumption
Rethink placement of preflash drum in crude preheat train network
Strategic location of the preflash drum not only resolves network problems, but, in some cases, reduces operating costs
Solving hydraulic problems in crude preheat train networks
Heat transfer and hydraulic problems need to be considered simultaneously
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Syensqo and Axens launch Argylium to accelerate Europe's solid-state battery breakthrough 1/6
- Samsung E&A breaks ground on 500,000-tpy ammonia facility in the U.S. 1/6
- Nova Sustainable Fuels project reaches key milestone with environmental assessment approval 1/6
- VLS Environmental Solutions acquires Merichem's caustic services business 1/6
- Phillips 66 says two U.S. Gulf Coast refineries can process Venezuelan crude 1/6
- Nigeria's Dangote oil refinery says fuel supply intact amid maintenance 1/6
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

