Yahyaabadi, R.
Consider practical conditions for vacuum unit modeling
A good simulation model is a tool that reveals critical operating conditions and can be applied to daily operations
Improve design strategies for refinery vacuum towers
Products yield and specifications with energy conservation goals can determine options to revamp distillation units
Increase distillation capacity with side heaters and coolers
Debottlenecking towers involves close review of product yields while reducing tray flooding and energy consumption
Rethink placement of preflash drum in crude preheat train network
Strategic location of the preflash drum not only resolves network problems, but, in some cases, reduces operating costs
Solving hydraulic problems in crude preheat train networks
Heat transfer and hydraulic problems need to be considered simultaneously
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Borouge to develop AI-powered autonomous UAE operations to accelerate growth and value creation 6/25
- Ch0C gas boiler: A French consortium innovates for industrial decarbonization 6/25
- Taiwanese container ship operator to install WinGD's methanol engines across more than 30 vessels 6/25
- EIA: U.S. crude and fuel inventories fall on higher demand 6/25
- Update: Venezuela's second largest refinery restarting units after blackout 6/25
- 3t introduces landmark training to empower women in Saudi Arabia’s energy sector 6/25
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction