Wide design margins do not improve engineering
Process Optimization
/ Project Management
/ Americas
/ Asia/Pacific
/ Compressors
/ Construction
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Management
/ Middle East
/ Piping
/ Pumps
/ Reactors
/ Turbines
/ Valves
Engineers use design and safety factors in sizing and specifying instrumentation or major process equipment, such as pumps, valves and compressors. Design factors are applied to cover the uncertainty ..
Overflow systems are the last line of defense
Environment & Safety
/ Maintenance & Reliability
/ Process Optimization
/ Refining
/ Carbon Management
/ Loss Prevention
/ Piping
/ Safety
/ Treating
/ Valves
The overflow system is the last line of defense against the excessive container filling. An overflow system consists of an overflow nozzle with internal and/or external piping and, in some cases, a si..
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Low U.S. distillate consumption reflects slow economic activity and biofuel substitution 4/25
- Clariant catalysts reduce customers’ footprints by 40 million tons of CO2e in 2023 4/25
- Singapore fuel oil stockpiles hit 20-week lows 4/25
- BASF with solid start to the year: EBITDA before special items in first quarter of 2024 slightly above analysts’ consensus 4/25
- Brazil's Timbro to export 40% more sugar, enter ethanol market in 2024 4/24
- LG Chem denies report it will merge naphtha cracker business with Lotte Chemical 4/24
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction