Toghraei, M.
Wide design margins do not improve engineering
Process Optimization
/ Project Management
/ Americas
/ Asia/Pacific
/ Compressors
/ Construction
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Management
/ Middle East
/ Piping
/ Pumps
/ Reactors
/ Turbines
/ Valves
Engineers use design and safety factors in sizing and specifying instrumentation or major process equipment, such as pumps, valves and compressors. Design factors are applied to cover the uncertainty ..
Overflow systems are the last line of defense
Environment & Safety
/ Maintenance & Reliability
/ Process Optimization
/ Refining
/ Carbon Management
/ Loss Prevention
/ Piping
/ Safety
/ Treating
/ Valves
The overflow system is the last line of defense against the excessive container filling. An overflow system consists of an overflow nozzle with internal and/or external piping and, in some cases, a si..
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Australia’s biggest LNG plants suffer outages due to cyclone, straining global supply 3/27
- Iran war chokes petrochemical supply, sends plastic prices soaring 3/27
- Stockholm Exergi taps Inprocess to deliver advanced process simulator for BECCS project 3/27
- Japan to relax rules from April to boost coal-fired power amid LNG import risks 3/27
- Velan releases upgrades to its delayed coker isolation valves 3/27
- AFPM: ‘Baffling’ final RFS will break cost records. In fact, it already is 3/27
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction