Beebe, D.
Dustin Beebe is the Vice President of Performance Software for Emerson. He is responsible for aligning the global control performance, operator performance and simulation businesses and the strategy synergy between Emerson and AspenTech. Before joining Emerson, Beebe served as the President of ProSys until Emerson acquired it in 2018. He has been in the industrial automation business since 1996. Beebe earned a BS degree in chemical engineering from the University of Arkansas in Fayetteville, Arkansas.
Don’t just survive: Thrive with advanced process control
Environment & Safety
/ Process Control
/ Process Optimization
/ Construction
/ Engineering & Design
/ Equipment
/ Information Systems
/ Loss Prevention
There is a new adage in process manufacturing circles, and it resonates particularly deeply in the hydrocarbon industry: If you do not like market factors today, just wait a month.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- BASF introduces BDO, THF, PolyTHF and NMP product variants with reduced product carbon footprint 3/9
- Equilibrion and Rolls-Royce sign MoU to advance SAF using nuclear energy 3/9
- Iverson eFuels to discontinue green ammonia project in Norway due to grid capacity 3/9
- Hypersonix’s DART AE completes its first flight, reaching hypersonic speeds 3/9
- U.S. fuel exports see slight uptick in 2025 3/9
- South Australia to host HAMR Energy’s first-of-its kind methanol-to-jet fuel facility 3/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

