Xiangling, Z.
is the vice chief engineer for CPECC’s East-China Design Branch. She has 27 years of experience in refinery design, with specialized expertise in the crude and vacuum distillation process and in general configuration design. Ms. Xiangling holds a BE degree from Zhengzhou University of technology in Zhengzhou, Henan, China.
Determine fouling margins in tubular heat exchanger design
Gas Processing/LNG
/ Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Refining
/ Americas
/ Asia/Pacific
/ Corrosion
/ Engineering & Design
/ Equipment
/ Europe
/ Heat Transfer
/ Middle East
Fouling, which is caused mainly by the deposition and accumulation of an undesired layer of solids on a heat transfer surface, is very common in tubular heat exchangers.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- U.S. EPA to remove proposed EV volumes from biofuel blending rule 6/6
- BASF increases alkoxylates production capacity in Europe 6/6
- Russia's Sakhalin invites India and China to tap energy resources 6/6
- Airlines urge co-operation to help curb emissions 6/6
- Oil prices steady as economic fears offset Saudi output cut 6/6
- U.S. diesel demand is falling despite economic growth 6/6
- VOC reduction at Raffineria di Milazzo’s SRU complex—Part 2
- Digital Technologies: Do not just monitor bad actor machines: Start when they are healthy
- People
- Editorial Comment
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
- How companies can take advantage of APM solutions to reduce planned maintenance
- Design considerations when flaring ethylene oxide
- Why sulfur plants fail: An in-depth study of sulfur recovery unit failures—Part 1
- Implement advanced level control techniques to improve crude distillation unit stabilizer performance
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction