Kumar, S.
LNG import terminal on a gravity base structure offshore
An alternative design to a land-based facility is a compact, modular construction resting on the seabed
Material selection for low-temperature applications
Analysis shows conventional metallurgy is usually adequate for process upsets
Use extractive distillation to simplify petrochemical processes
Advances in solvent technology enable using extraction methods to separate close boiling point compounds cost-effectively
Simple method determines flow regime for friction factor calculations
Use these criteria to avoid trial-anderror procedures
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- ITT to acquire SPX Flow for > $4.77 B, expanding leadership in highly engineered components and adjacent flow technologies 12/5
- MOL Group introduces eco-friendly Bag-in-Box packaging for lubricants 12/5
- Addis Energy secures $8.3 MM to scale its transformative approach to low-cost ammonia production 12/5
- World Fuel Services supplies cruise line with waste-based biofuels 12/5
- Chevron announced $18 B-$19-B CAPEX budget for 2026 12/5
- Russia and India sign deal to build urea plant in Russia 12/5
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

