Parisi, P.
is the vice president (VP) of marketing for Compressor Controls Corp. (CCC) Global. He previously served as VP of sales and marketing with FOMAS Group, and as oil and gas marketing leader with GE. Mr. Parisi earned his MBA degree in global management and international business from the University of Phoenix
Optimizing turbomachinery energy savings with control technologies
Plant managers who work in a hydrocarbon-processing-industry (HPI), power-generation or other industrial facility can relate to the need to optimize energy consumption. Opportunities to reduce unneces..
HP Viewpoint: Optimize control systems with preventive maintenance
Process Optimization
/ Project Management
/ Americas
/ Asia/Pacific
/ Compressors
/ Drivers
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Management
/ Middle East
/ Motors
/ Pumps
/ Rotating Equipment
/ Safety
/ Turbines
Ensuring equipment integrity by conducting thorough maintenance provides multiple benefits, from maximizing machine uptime and minimizing process shutdowns, to prolonged equipment service life and imp..
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Petrobras wrapping up due diligence to buy back refinery from Mubadala 7/26
- US court rejects EPA denials of 2022 small refinery biofuel waivers 7/26
- Mexico seeks more 2025 fuel import deals after refinery delays 7/26
- PETRONAS, Eni and Euglena reach FID to construct a biorefinery in Malaysia 7/26
- ExxonMobil signs carbon capture agreement with CF Industries in Mississippi (U.S,) 7/26
- WoodMac: LNG truck sales impacting Chinese road diesel demand 7/26
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction