Eskandarlu, A.
a mechanical engineering graduate from Azad University, has been actively involved in the area of rotating and packaged equipment engineering since 2005. Since he joined Chagalesh Consulting Engineers in 2008, he has been engaged in many hydrocarbon processing projects as a machinery lead engineer. He holds a head position in the machinery department of Chagalesh and is also an instructor of pump and compressor courses.
Compare pitot tube pumps with high-speed centrifugal pumps for low-flow applications
When seeking a pump for a low-flow, high-head application, there is a temptation to choose a high-speed (HS) integral gear-driven centrifugal pump because of its advantages over multi-stage centrifugal and other types of pumps.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- INEOS' CEO, Jim Ratcliffe, calls on European politicians to make 11th hour intervention to save Europe's chemical industry 10/9
- NTPC carbon capture project produces first drop of methanol using captured CO2 10/9
- Clariant unveils titanium-based catalyst solutions for more sustainable polyester production 10/9
- Solvay achieves near-total water independence, with Veolia’s advanced reuse technologies and tailored long-term service agreement in Brazil 10/9
- Aramco completes acquisition of additional stake in Petro Rabigh 10/9
- FourPoint Resources, Energy Transfer to facilitate expansion of Price River Terminal in Utah (U.S.) 10/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction