Musti, M.
Michele Musti has worked at Belleli Energy CPE since 1983, and is presently a Welding Engineer Supervisor. He is certified as an International Welding Technologist (IWT).
Improve welding technology for heavy-wall pressure vessels in creep-resistant steel
The standard practice recommended for high-pressure vessels with heavy wall thickness requires the implementation of weld joint preparation with a narrow gap technique. This generally calls for a two-beads-per-layer sequence, along with the use of the submerged arc welding (SAW) process.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- BASF intends to take over shares in Alsachimie JV from DOMO Chemicals 5/28
- ExxonMobil to sell French subsidiary Esso to Canadian energy group 5/28
- UPM cancels second Rotterdam biomass-to-fuels refinery 5/28
- Uniper, thyssenkrupp Uhde partner to build large-scale ammonia cracker in Germany 5/27
- Wood selected as project management consultancy for first major methanol plant in the UAE 5/27
- Indian refiner Reliance's April Russian oil imports up 55% m/m 5/27
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction