Fusari, F.
Fausto Fusari is Vice President of Technology at Belleli Energy CPE in Mantova, Italy. Mr. Fusari began his career at the Belleli Energy CPE Mantova shop as a welding engineer in 1980, and was appointed Welding Engineering Supervisor in 1989. He earned a master’s degree in welding engineering in 1977.
Improve welding technology for heavy-wall pressure vessels in creep-resistant steel
The standard practice recommended for high-pressure vessels with heavy wall thickness requires the implementation of weld joint preparation with a narrow gap technique. This generally calls for a two-beads-per-layer sequence, along with the use of the submerged arc welding (SAW) process.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- BP Europa SE announces intended sale of Ruhr Oel GmbH-BP Gelsenkirchen refinery in Germany 2/6
- ZeroAvia invited to join second round of UK CAA’s Hydrogen Sandbox Challenge 2/6
- Polyplastics to launch 40% glass-filled recycled grade of DURAFIDE (R) PPS 2/6
- Landus and TalusAg deliver first local green ammonia production in North America 2/6
- Power2X awards Worley contract for its 250,000-tpy eFuels Rotterdam project 2/5
- Digital Exclusive: Executive viewpoint-Recycled plastic used in roads as Aramco adopts the circular economy 2/5
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction