Fusari, F.
Fausto Fusari is Vice President of Technology at Belleli Energy CPE in Mantova, Italy. Mr. Fusari began his career at the Belleli Energy CPE Mantova shop as a welding engineer in 1980, and was appointed Welding Engineering Supervisor in 1989. He earned a master’s degree in welding engineering in 1977.
Improve welding technology for heavy-wall pressure vessels in creep-resistant steel
The standard practice recommended for high-pressure vessels with heavy wall thickness requires the implementation of weld joint preparation with a narrow gap technique. This generally calls for a two-beads-per-layer sequence, along with the use of the submerged arc welding (SAW) process.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Gevo granted U.S. patent for its novel ethanol-to-olefins process technology 9/17
- SOCAR awards NEXTCHEM two contracts to upgrade/expand Heydar Aliyev refinery in Azerbaijan 9/17
- KazMunayGas begins construction on $7.4-B polyethylene complex in Kazakhstan 9/17
- Zeopore prepares for global production of economical, premium hydrocracking meso-zeolites 9/17
- Shipping industry outlines protocol to incentivize methane reduction 9/17
- KBC acquires Flaretot Limited, a software provider specializing in flare system designs 9/17
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction