Fusari, F.
Fausto Fusari is Vice President of Technology at Belleli Energy CPE in Mantova, Italy. Mr. Fusari began his career at the Belleli Energy CPE Mantova shop as a welding engineer in 1980, and was appointed Welding Engineering Supervisor in 1989. He earned a master’s degree in welding engineering in 1977.
Improve welding technology for heavy-wall pressure vessels in creep-resistant steel
The standard practice recommended for high-pressure vessels with heavy wall thickness requires the implementation of weld joint preparation with a narrow gap technique. This generally calls for a two-beads-per-layer sequence, along with the use of the submerged arc welding (SAW) process.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Clariant catalysts continue to shrink customer footprints: 45M tons of CO2e avoided in 2025 5/26
- Mitsubishi Chemical Group considers spinning off petrochemicals business 5/26
- Hitachi Energy and Volvo Construction Equipment announce collaboration to accelerate zero-emissions construction sites 5/26
- Aramco and PETRONAS Announce Transfer of Full Ownership of PRefChem to PETRONAS 5/26
- ENOC and Allied Biofuels sign MoU to explore offtake/distribution of SAF and eSAF 5/26
- Hanwha Power and the University of Alberta sign MoU to advance R&D of low-carbon power technologies 5/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction