Musti, M.
Michele Musti has worked at Belleli Energy CPE since 1983, and is presently a Welding Engineer Supervisor. He is certified as an International Welding Technologist (IWT).
Improve welding technology for heavy-wall pressure vessels in creep-resistant steel
The standard practice recommended for high-pressure vessels with heavy wall thickness requires the implementation of weld joint preparation with a narrow gap technique. This generally calls for a two-beads-per-layer sequence, along with the use of the submerged arc welding (SAW) process.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- WestJet buys first Canadian-supplied SAF by Shell Aviation 4/23
- Technip Energies selected by Viridor to perform FEED on the Runcorn energy-from-waste carbon capture project in the UK 4/23
- SINOPEC completes its involvement in Kazakhstan's polyethylene project 4/23
- Neste premieres at Chinaplas: showcasing possibilities of bio-based and recycled materials for plastics 4/23
- Russia's oil refining near 11-month low 4/23
- Haiti fuel terminal operations halted as gangs seize trucks 4/23
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction