Fausto Fusari is Vice President of Technology at Belleli Energy CPE in Mantova, Italy. Mr. Fusari began his career at the Belleli Energy CPE Mantova shop as a welding engineer in 1980, and was appointed Welding Engineering Supervisor in 1989. He earned a master’s degree in welding engineering in 1977.
Improve welding technology for heavy-wall pressure vessels in creep-resistant steel
The standard practice recommended for high-pressure vessels with heavy wall thickness requires the implementation of weld joint preparation with a narrow gap technique. This generally calls for a two-beads-per-layer sequence, along with the use of the submerged arc welding (SAW) process.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- WinGD delivers exceptional results in full-load X-DF-A ammonia engine test 3/14
- COAMO Agroindustrial Cooperativa selects ICM for design and engineering of new corn biorefinery in Brazil 3/14
- South Dakota (U.S.) bans use of eminent domain for CO2 pipelines 3/14
- ABB and Charbone Hydrogen sign agreement to advance North American green H2 production facilities 3/14
- U.S., Vietnam firms sign deals on energy and minerals 3/14
- Russian diesel continues to flow to Syria on U.S.-sanctioned tankers 3/14
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction