Fusari, F.
Fausto Fusari is Vice President of Technology at Belleli Energy CPE in Mantova, Italy. Mr. Fusari began his career at the Belleli Energy CPE Mantova shop as a welding engineer in 1980, and was appointed Welding Engineering Supervisor in 1989. He earned a master’s degree in welding engineering in 1977.
Improve welding technology for heavy-wall pressure vessels in creep-resistant steel
The standard practice recommended for high-pressure vessels with heavy wall thickness requires the implementation of weld joint preparation with a narrow gap technique. This generally calls for a two-beads-per-layer sequence, along with the use of the submerged arc welding (SAW) process.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- LanzaJet expands partnership with Microsoft to strengthen the company’s global growth 6/13
- Phelan Green Group's $2.6-B eMethanol project remains on schedule 6/13
- Algeria launches $7-B investment plan to expand hydrocarbon processing 6/13
- AFPM/API: President Trump officially overturns California (U.S.) gas car ban 6/12
- Decision on oil refiner Italiana Petroli's sale expected around end-June 6/12
- EIA: U.S. crude stocks fall, gasoline and distillate inventories rise as refining activity increases 6/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction