Alberini, S.
Stefano Alberini ia a Welding Engineer at Belleli Energy CPE Srl and has 10 yr of experience as a certified welding engineer. He received his MS degree in mechanical engineering from Bologna University in Italy in 2003, and has been certified as an International Welding Engineer (IWE) by the Italian Institute of Welding since 2006.
Improve welding technology for heavy-wall pressure vessels in creep-resistant steel
The standard practice recommended for high-pressure vessels with heavy wall thickness requires the implementation of weld joint preparation with a narrow gap technique. This generally calls for a two-beads-per-layer sequence, along with the use of the submerged arc welding (SAW) process.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Jinggong Group, Yokogawa sign multi-faceted strategic partnership on mutual business development 6/11
- USA BioEnergy secures long-term feedstock supply for $2.8-B SAF refinery in Texas (U.S.) 6/11
- GameChange Solar secures 450-MWp order for green ammonia project in Oman 6/11
- Russia's offline primary oil refining capacity revised up 21% in July 6/11
- Borouge awards ADNOC L&S 15-year contract to accelerate growth of UAE petrochemical exports 6/11
- TOYOTA GAZOO Racing unveils liquid hydrogen-fueled "GR LH2 Racing Concept" at Le Mans 6/11
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction