Spalding, M.
Michael Spalding has been a Coking Mechanical Specialist with Bechtel Hydrocarbon Technology Solutions Inc. (BHTS) for the past 5 yr.
Enhanced flash zone design for coker fractionators
Process Optimization
/ Refining
/ Construction
/ Corrosion
/ Engineering & Design
/ Africa
/ Americas
/ Asia/Pacific
/ Europe
/ Middle East
Since the flash zone is the first process undergone by the coke drum effluent vapor upon entering the column, the operation of the flash zone is critical to the operation of the entire coker fractionator column.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- U.S. fuel ethanol exports rise on strong international demand and low U.S. prices 11/6
- LanzaTech and Eramet plan integrated CCUS project in Norway 11/6
- DG Fuels to launch SAF plant in Minnesota (U.S.), converting biomass into high-value fuel 11/6
- Marathon Petroleum's 3Q profit beats, boosts share buybacks by $5 B 11/6
- U.S. crude stocks, gasoline and distillate inventories rise 11/6
- Fire at Tupras oil refinery in Turkey wounds 12 11/5
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction