Spalding, M.
Michael Spalding has been a Coking Mechanical Specialist with Bechtel Hydrocarbon Technology Solutions Inc. (BHTS) for the past 5 yr.
Enhanced flash zone design for coker fractionators
Process Optimization
/ Refining
/ Construction
/ Corrosion
/ Engineering & Design
/ Africa
/ Americas
/ Asia/Pacific
/ Europe
/ Middle East
Since the flash zone is the first process undergone by the coke drum effluent vapor upon entering the column, the operation of the flash zone is critical to the operation of the entire coker fractionator column.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- ExxonMobil plans 1 Blbs/yr of advanced recycling by 2027 11/22
- Gauging the likely Trump effect on U.S. energy and power sectors 11/22
- Russia's Lukoil restoring cracker at NORSI refinery, gasoline output rising 11/22
- Nigeria's local currency crude sales fall short of target, Dangote refinery says 11/22
- U.S. October gasoline imports hit post-pandemic low on slump in European shipments 11/22
- Clean Hydrogen Works awards McDermott FEED contract for Ascension Clean Energy (ACE) project 11/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction