Izadi, M.
At the time of this writing, Mahmood Izadi was a Senior Packaged Equipment Specialist at Bechtel Corp. in Houston, Texas. He has more than 15 yr of experience in the oil, academia and manufacturing sectors. He earned a PhD in mechanical engineering from Clarkson University in Potsdam, New York. He has published articles on fouling mitigation in heat exchangers, power plant optimization and heat exchanger design.
Transient analysis of fired heater coils to estimate safety time
During the operation of process fired heaters, the potential exists for sudden interruption of process flow.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- U.S. says there are significant undiscovered oil and gas resources in Wyoming 5/21
- Bureau Veritas grants AiPs for IMODCO’s portfolio of jetty-less solutions for new energies transfers 5/21
- Saudi Arabia crude exports fall to 5.754 MMbpd in March 5/21
- Low diversity in critical mineral markets could hurt industry, IEA says 5/21
- India's Russian oil imports hit 10-month high on strong demand for ESPO crude 5/21
- Akselos tackles flange failures with breakthrough SPM module 5/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction