Thakur, M.
Mohit Thakur is a Senior Process Engineer at Bechtel Corp. He has more than 12 yr of experience in process and equipment design, engineering and dynamic simulations in the oil, gas and chemicals industries. He graduated with a thesis in chemical engineering from Lamar University in Beaumont, Texas.
Optimize transient plant operations with castable-free fired heater
Fired heaters are designed with castable refractory in various sections of the heater.
Transient analysis of fired heater coils to estimate safety time
During the operation of process fired heaters, the potential exists for sudden interruption of process flow.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Meridian Energy Group’s Davis Refinery Project in North Dakota (U.S.) will be the world’s first net-zero carbon refinery 4/17
- Lummus expands R&D capabilities to enhance innovation and water and wastewater technologies 4/17
- Niger plans to build diesel refinery and increase supplies to Mali 4/17
- BASF, SABIC, and Linde celebrate the start-up of the world's first large-scale electrically heated steam cracking furnace 4/17
- U.S. crude stocks rise, gasoline, distillate inventories fall 4/17
- Russia's offline primary oil refining capacity revised up for April 4/17
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction