Izadi, M.
At the time of this writing, Mahmood Izadi was a Senior Packaged Equipment Specialist at Bechtel Corp. in Houston, Texas. He has more than 15 yr of experience in the oil, academia and manufacturing sectors. He earned a PhD in mechanical engineering from Clarkson University in Potsdam, New York. He has published articles on fouling mitigation in heat exchangers, power plant optimization and heat exchanger design.
Transient analysis of fired heater coils to estimate safety time
During the operation of process fired heaters, the potential exists for sudden interruption of process flow.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Borouge set to boost production capacity to over 6.6 MMtpy 4/28
- Sri Lanka to begin talks with India, UAE for new energy hub 4/28
- S-Oil posts refining, petrochemical losses; expects US tariffs to affect margins in Q2 4/28
- Kuwait Petroleum's stake investment in China Wanhua Chemical's unit valued at $638 MM 4/28
- Chemical maker LyondellBasell misses quarterly profit estimates on weak volumes 4/28
- Trump administration (U.S.) to allow temporary sales of summertime higher-ethanol fuel 4/28
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction