Izadi, M.
At the time of this writing, Mahmood Izadi was a Senior Packaged Equipment Specialist at Bechtel Corp. in Houston, Texas. He has more than 15 yr of experience in the oil, academia and manufacturing sectors. He earned a PhD in mechanical engineering from Clarkson University in Potsdam, New York. He has published articles on fouling mitigation in heat exchangers, power plant optimization and heat exchanger design.
Transient analysis of fired heater coils to estimate safety time
During the operation of process fired heaters, the potential exists for sudden interruption of process flow.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Jet fuel demand growth lags as air traffic exceeds pre-pandemic level 4/19
- Jet2.com to use SAF at London Stansted Airport 4/19
- Neste and New Jersey Natural Gas target reducing greenhouse gas emissions with Neste MY Renewable Diesel 4/19
- Cepsa and Evos join up for green methanol storage in Spain and the Netherlands 4/19
- Russia's Bashneft oil company installs anti-drone nets to protect refineries 4/19
- Hapag-Lloyd and Seaspan to retrofit five vessels to methanol propulsion 4/19
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction