Asgar-zadeh, S.
Saadat Asgar-zadeh is head of Integrated Refining and Feasibility Studies in the Institute of Petrochemical Processes. She has more than 45 yr of experience in refinery processes. Dr. Asgar-zadeh holds a doctorate in technical sciences and has authored more than 100 scientific papers. She was awarded a certificate of merit from the Azerbaijan National Academy of Science in 2011 and a progress medal in 2013.
Technical considerations for the Heydar Aliyev refinery revamp
Environment & Safety
/ Petrochemicals
/ Process Optimization
/ Project Management
/ Refining
/ Acid Gas Removal
/ Europe
/ Construction
/ Diesel
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Gasoline
/ Greenhouse Gases
/ Hydrotreating
/ Naphtha
/ Natural Gas
/ Products
/ Pumps
/ Reactors
/ Safety
/ Treating
The following case study describes the early development phases of SOCAR’s ongoing major revamp project at the Heydar Aliyev Refinery (HAR) in Baku, Azerbaijan, and its interface with the associated Azerikimya (AZK) steam cracking complex near Sumgait. References are made to the related SOCAR polymer project in Sumgayit, as well.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Sinopec's $4.5-B refinery in Sri Lanka to challenge India's fuel export market share 4/30
- Topsoe secures first SAF project in China 4/30
- Borouge increases Q1 net profit nearly 40% to $273 MM 4/30
- NEXTCHEM finalizes acquisitions of HyDEP and Dragoni to boost green H2 production tech 4/30
- Sponsored Digital Feature: Cut the carbon and boost sustainability 4/30
- Carbon Clean achieves fabrication milestone on FlagshipONE with the project’s first carbon capture unit module 4/30
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction