Donnelly, P.
Paul Donnelly is the Industry Marketing Director for Engineering and Construction at AspenTech. Mr. Donnelly has more than 25 yr of experience in engineering, construction and supply chain management positions with global business responsibilities. He earned an undergraduate degree in geology and has an MBA from the University of Massachusetts.
Why EPC firms are accelerating digitalization
Even before the challenges of the COVID-19 pandemic emerged, engineering, procurement and construction (EPC) firms were already under considerable stress.
Business Trends: EPC 2030: Five vital characteristics that will define the EPC firm of tomorrow
The state of the global engineering, procurement and construction (EPC) industry can accurately be described as “challenging.” Operating in an environment of volatile, uncertain, complex and ambiguous conditions, EPC firms are facing unsustainable levels of stress.
Capital projects are making a comeback, but are EPC firms ready?
After several years of cutting costs to align to the reality of fewer and smaller capital projects, engineering, procurement and construction (EPC) firms are now forging ahead as the industry recovers.
- 1
- ... 1 pages

- EPA's proposed eRIN program raises concerns and sparks legislative action 6/8
- Neste enables Swedish airport and Västflyg airline to become the world's firsts to use SAF on all flights 6/8
- Valtek Valdisk High Performance Butterfly Valve, completes million-cycle test 6/8
- The sustainable aviation fuel entrepreneurs poised for takeoff 6/8
- India's May fuel consumption soars on robust manufacturing 6/8
- Kent awarded three-year multi-site Master Services Agreement with TotalEnergies 6/8
- VOC reduction at Raffineria di Milazzo’s SRU complex—Part 2
- Digital Technologies: Do not just monitor bad actor machines: Start when they are healthy
- People
- Editorial Comment
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
- How companies can take advantage of APM solutions to reduce planned maintenance
- Design considerations when flaring ethylene oxide
- Why sulfur plants fail: An in-depth study of sulfur recovery unit failures—Part 1
- Implement advanced level control techniques to improve crude distillation unit stabilizer performance
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units