Banerjee, P.
Implementing advanced process control on ammonia plants
Petrochemicals
/ Process Control
/ Process Optimization
/ Project Management
/ Acid Gas Removal
/ Americas
/ Analyzers
/ Asia/Pacific
/ Construction
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Information Systems
/ Management
/ Middle East
/ Safety
Benefits exceeding the guarantee were realized through APC by simultaneously stabilizing and optimizing the plant in the presence of significant feed density variations that impact the entire plant operation
Implementing and maintaining advanced process control on continuous catalytic reforming
The primary benefit was an increase in reformate octane barrel yield from operating the plant at its economic constraints
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Ineos to shut polystyrene facility in Illinois (U.S.) by the end of the year 6/19
- How ASTM approval of methanol-to-jet accelerates SAF at scale 6/19
- EU crafts plan to give industries extra free CO2 permits this year 6/19
- PetroChina forecasts Chinese oil consumption will drop 4.9% this year 6/19
- Digital Exclusive: Water injection pump mechanical seals failure after pump shutdown 6/19
- Russian gasoline output down 25% so far in June after drone attacks on refineries 6/19
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

