Chauvin, J.
Jay Chauvin is the Petrochemical and Refining sector leader for Aggreko.
Optimization: Plan before main air blower disaster strikes
Environment & Safety
/ Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Refining
/ Compressors
/ Equipment
/ Loss Prevention
/ Management
/ Safety
/ Americas
Weeks before a planned overhaul of its coker unit, a synthetic crude plant’s main air blower for the furnace failed, throwing the engineers’ plans into disarray.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Emerson’s ‘Project Beyond’ to modernize and seamlessly integrate the industrial automation technology stack 5/20
- Neste starts SAF production at its Rotterdam refinery 5/20
- ADNOC and EGA sign $500-MM deal to localize supply of key raw material in aluminum production 5/20
- hte and Heraeus Precious Metals collaborate on catalytic ammonia cracking 5/20
- HPCL aims to start crude unit at 9-MMtpy Rajasthan refinery (India) in October 5/20
- Russia in favor of extending partial gasoline export ban 5/20
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction