Chauvin, J.
Jay Chauvin is the Petrochemical and Refining sector leader for Aggreko.
Optimization: Plan before main air blower disaster strikes
Environment & Safety
/ Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Refining
/ Compressors
/ Equipment
/ Loss Prevention
/ Management
/ Safety
/ Americas
Weeks before a planned overhaul of its coker unit, a synthetic crude plant’s main air blower for the furnace failed, throwing the engineers’ plans into disarray.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Ineos to shut polystyrene facility in Illinois (U.S.) by the end of the year 6/19
- How ASTM approval of methanol-to-jet accelerates SAF at scale 6/19
- Russian gasoline output down 25% so far in June after drone attacks on refineries 6/19
- Iraq to export crude, naphtha through Syria after Hormuz shock 6/19
- Majority of Iranian petrochemical units back to production 6/19
- Hanwha Ocean signs strategic MoU with Kanata Clean Power for proposed $15.7-B, 12-MMtpy FLNG project in Canada 6/18
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

