Achieve successful compressor startup by addressing dry-gas seal failure
A common root cause for compressor failure during first startup is a failure of the dry-gas seal (DGS) system. To avoid failures of gas compressors, the project team and end users must understand the importance and significance of the DGS very early in the basic design phase.
IP: 18.221.18.145
This is a preview of our premium content. Thank you for your interest—please
log in or
subscribe to read the full article.
The Author
Zardynezhad, S. - Toyo Engineering Canada Ltd., Calgary, Alberta, Canada
Shahab Zardynezhad, PMP, is a registered Senior Mechanical Equipment Engineer in Alberta. He has 24 yr of experience working on many of the world’s largest oil, gas and petrochemical projects. His areas of specialization and industrial experience include engineering, design, procurement, inspection, installation, startup, maintenance, troubleshooting of general and special-purpose rotating equipment, with special concern on project management subjects and “fitness-for-purpose” consideration. He holds a BS degree in mechanical engineering from the University of Petroleum, an MS degree in industrial engineering from I.U.S.T, and a MEng degree in project management from the University of Calgary.
Related Articles
From the Archive
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction
Comments