December 2013
Refining Developments
Mitigate fouling in crude unit overhead—Part 3
CASE STUDYThe basis for this case study is shown in Fig. 18; it is a crude unit with overhead heat integration. This is a one-drum overhead system with heat integration and no water wash. In an attemp..
This is a preview of our premium content. Thank you for your interest—please log in or subscribe to read the full article.
Comments