April 2011
Plant Design and Engineering
How you can precommission process plants systematically
Follow these guidelines for the best logical sequence for startup preparations
This is a preview of our premium content. Thank you for your interest—please log in or subscribe to read the full article.
The Author
Related Articles
- Common challenges in risk-based inspection for piping: Insights from experience
- Hydrocarbon value chain optimization: Non-CAPEX opportunities to improve gross margins for the downstream sector—Part 2
- Optimizing NGL treatment for sulfur and methanol reduction at Pembina NGL Corporation’s Redwater fractionation plant—Part 2
Comments