Parker, C.
Chris Parker was born and raised in Tulsa, Oklahoma (U.S.) and obtained his BS degree in mechanical engineering with a minor in petroleum engineering from Oklahoma State University. He has been involved with the combustion industry as an employee of Zeeco for 12 yr. During his time at Zeeco, Parker has worked as a test facility engineer in Zeeco’s test facility for 3 yr, applications engineer for 7 yr and applications engineering manager for 2 yr.
End-to-end H2 firing solutions
To meet corporate and global net-zero carbon initiatives, many refining and chemical industry plant owners are considering refueling existing fired equipment with sustainable, low-carbon fuels.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Kumho Mitsui Chemicals to increase capacity of MDI production facilities 12/15
- ABS, Eneos, NYK Line and Seacor Holdings launch joint study to develop a methanol marine fuel supply network in the U.S. 12/15
- ENEOS accelerates AI-driven materials discovery of immersion cooling fluids and novel catalysts Using NVIDIA ALCHEMI 12/15
- SAMSUNG E&A wins FEED contract for nearly $5-B SAF plant in the U.S. 12/15
- KBR wins green ammonia project by IGNIS in Spain 12/15
- Phillips 66 announces $2.4-B capital budget for 2026 12/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

