Parker, C.
Chris Parker was born and raised in Tulsa, Oklahoma (U.S.) and obtained his BS degree in mechanical engineering with a minor in petroleum engineering from Oklahoma State University. He has been involved with the combustion industry as an employee of Zeeco for 12 yr. During his time at Zeeco, Parker has worked as a test facility engineer in Zeeco’s test facility for 3 yr, applications engineer for 7 yr and applications engineering manager for 2 yr.
End-to-end H2 firing solutions
To meet corporate and global net-zero carbon initiatives, many refining and chemical industry plant owners are considering refueling existing fired equipment with sustainable, low-carbon fuels.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Ineos to shut polystyrene facility in Illinois (U.S.) by the end of the year 6/19
- How ASTM approval of methanol-to-jet accelerates SAF at scale 6/19
- Digital Exclusive: Water injection pump mechanical seals failure after pump shutdown 6/19
- Russian gasoline output down 25% so far in June after drone attacks on refineries 6/19
- Iraq to export crude, naphtha through Syria after Hormuz shock 6/19
- Majority of Iranian petrochemical units back to production 6/19
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

