Datta, K. A.
Better manage vacuum on gas systems
A systematic approach estimates optimum conditions to prevent air ingress for flares
Consider continuous thermodynamics approach for modeling
A new simulation method selectively uses key components to optimize various refining units
Systematic depressurization design is more than just a safety necessity
Implementing this approach can save money while meeting required regulations
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- BASF supports European 1,4‑butanediol supply security through increased production in Ludwigshafen 2/16
- Vitol backs proposed $3-billion LNG power plant for South Africa's Durban port 2/16
- HAMR Energy receives additional funding for low-carbon liquid fuels projects 2/16
- Geoinform, subsidiary of the MOL Group, signs strategic cooperation agreement with Baker Hughes 2/16
- Hungary asks Croatia for help after Russian oil flows via Ukraine halted 2/16
- U.S. refiner Valero to import up to 6.5 MMbbl of Venezuelan crude in March 2/16
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

