Bourji, A.
is a senior technical director at WorleyParsons in Houston, Texas. Dr. Bourji received his BS and MS degrees in chemical engineering from the University of Houston and his doctorate degree from Lamar University. He is a professional engineer and a member of AIChE and AFPM. Dr. Bourji is the author of numerous publications and serves on the Chemical Engineering PhD Advisory Council at Lamar University.
Design and implement a totally enclosed ground flare
As awareness of environmental issues increases to new levels, all emissions sources in industrial facilities are falling under more scrutiny than ever before.
Find benefits in automating boiler systems
Process Control
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Europe
/ Heat Transfer
/ Middle East
/ Utilities
Dynamic models unravel potential problems in high-pressure steam production and consumption
Convert waste heat into eco-friendly energy
Environment & Safety
/ Gas Processing/LNG
/ Petrochemicals
/ Process Optimization
/ Refining
/ Acid Gas Removal
/ Alcohols
/ Americas
/ Asia/Pacific
/ Boilers
/ Carbon Management
/ Compressors
/ Construction
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Furnaces
/ Greenhouse Gases
/ Heat Transfer
/ Loss Prevention
/ Middle East
New developments, such as the organic Rankine cycle, help operations go ‘green’
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Clariant launches innovative PFAS-free polymer processing aids for more sustainable polyolefin extrusion 6/5
- Solvay and BASF together reduce scope 3 emissions in hydrogen peroxide production 6/5
- Equinor's Mongstad refinery shut after power outage, gas leak 6/5
- ~2,000 gallons of diesel spills in Baltimore waterfront, U.S. officials say 6/5
- Asia's fuel oil imports from Iraq hit 4-month high in May 6/5
- Japan's Eneos begins unplanned shutdown at 77,000-bpd unit at Kawasaki 6/5
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction