Cipriano, B.
Bani Cipriano is an FCC Segment Marketing Manager, Light Olefins at W.R. Grace & Co. He manages the max propylene FCC portfolio at Grace. His goal is to commercialize next-generation max propylene catalysts and additives to deliver the most value to customers in this important growth segment. Dr. Cipriano earned his BS degree and PhD in chemical engineering from the University of Maryland, College Park.
Conventional FCC to maximum propylene production
Petrochemicals
/ Process Optimization
/ Refining
/ Catalysts
/ Diesel
/ Distillation
/ Economics
/ Engineering & Design
/ Equipment
/ Gasoline
/ Hydrogen
/ Polymers
/ Products
/ Reactors
/ Americas
Fluid catalytic cracking is one of the most important conversion processes used in refineries. This process converts heavy petroleum fractions into lighter, higher-value products, such as gasoline, propylene and others.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- EPA's proposed eRIN program raises concerns and sparks legislative action 6/8
- Neste enables Swedish airport and Västflyg airline to become the world's firsts to use SAF on all flights 6/8
- Valtek Valdisk High Performance Butterfly Valve, completes million-cycle test 6/8
- The sustainable aviation fuel entrepreneurs poised for takeoff 6/8
- India's May fuel consumption soars on robust manufacturing 6/8
- Kent awarded three-year multi-site Master Services Agreement with TotalEnergies 6/8
- VOC reduction at Raffineria di Milazzo’s SRU complex—Part 2
- Digital Technologies: Do not just monitor bad actor machines: Start when they are healthy
- People
- Editorial Comment
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
- How companies can take advantage of APM solutions to reduce planned maintenance
- Design considerations when flaring ethylene oxide
- Why sulfur plants fail: An in-depth study of sulfur recovery unit failures—Part 1
- Implement advanced level control techniques to improve crude distillation unit stabilizer performance
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction