Dharia, D.
Dilip Dharia is a Senior Director for the High-Olefin FCC Technology program at TechnipFMC Process Technology. He is responsible for all aspects of managing the program, including technology development, business development and licensing worldwide. He has been with TechnipFMC for approximately 40 yr and has 45 yr of experience in the areas of refining, petrochemical, gas processing and advanced energy conversion systems. He earned MS and BCh degrees in chemical engineering and an MS degree in administration.
Conventional FCC to maximum propylene production
Petrochemicals
/ Process Optimization
/ Refining
/ Catalysts
/ Diesel
/ Distillation
/ Economics
/ Engineering & Design
/ Equipment
/ Gasoline
/ Hydrogen
/ Polymers
/ Products
/ Reactors
/ Americas
Fluid catalytic cracking is one of the most important conversion processes used in refineries. This process converts heavy petroleum fractions into lighter, higher-value products, such as gasoline, propylene and others.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Petrobras wrapping up due diligence to buy back refinery from Mubadala 7/26
- US court rejects EPA denials of 2022 small refinery biofuel waivers 7/26
- Mexico seeks more 2025 fuel import deals after refinery delays 7/26
- PETRONAS, Eni and Euglena reach FID to construct a biorefinery in Malaysia 7/26
- ExxonMobil signs carbon capture agreement with CF Industries in Mississippi (U.S,) 7/26
- WoodMac: LNG truck sales impacting Chinese road diesel demand 7/26
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction